• Software Download
  • Manual
  • Tutorial
  • CloudNest
How to Change the Calculation Method for Utilization in Report

Function description

Calculation method for Utilization in CloudNest report can be changed to meet different needs.

Operation steps

1.Select result in CloudNest Layout List, 【Right-click】 – 【Report】.

 

2.Click 【Edit template】.

 

3.Find Utilization, click the small gear, and select calculation method.

 

Parameter description

Net material calculation method:

    • Calculate based on the net area of the parts (accumulation of net area of parts).
    • Calculate according to the part enclosure box (area enclosed by the envelope formed by the parts ).

Raw material calculation method:

    • Whole plate (plate area).
    • Excluding remain (when the remnant path is added in the layout, the area of remain will be excluded from the calculation).

Note:

    • Only when net material is calculated based on net area of parts, can the raw material calculation method be excluding remain.
    • Only by adding the remnant path in the layout can the Utilization is calculated excluding the area of remain.
How to Change the Calculation Method for Utilization in Report 742view

Function description

Calculation method for Utilization in CloudNest report can be changed to meet different needs.

Operation steps

1.Select result in CloudNest Layout List, 【Right-click】 – 【Report】.

 

2.Click 【Edit template】.

 

3.Find Utilization, click the small gear, and select calculation method.

 

Parameter description

Net material calculation method:

    • Calculate based on the net area of the parts (accumulation of net area of parts).
    • Calculate according to the part enclosure box (area enclosed by the envelope formed by the parts ).

Raw material calculation method:

    • Whole plate (plate area).
    • Excluding remain (when the remnant path is added in the layout, the area of remain will be excluded from the calculation).

Note:

    • Only when net material is calculated based on net area of parts, can the raw material calculation method be excluding remain.
    • Only by adding the remnant path in the layout can the Utilization is calculated excluding the area of remain.