To achieve higher welding quality in the steel structure industry, the ends of parts are first welded onto run-on/run-off plates before trimming the excess, thereby preventing any reduction in the cross-sectional area at the weld.
1.Select the parts, and then click Batch Modify → Batch Flange Chamfering Without Cutting Through.
2.Set Microjoint Size at the chamfers, with values ranging from 2 to 10 mm.
3.The effect after applying the settings is as shown below.
To achieve higher welding quality in the steel structure industry, the ends of parts are first welded onto run-on/run-off plates before trimming the excess, thereby preventing any reduction in the cross-sectional area at the weld.
1.Select the parts, and then click Batch Modify → Batch Flange Chamfering Without Cutting Through.
2.Set Microjoint Size at the chamfers, with values ranging from 2 to 10 mm.
3.The effect after applying the settings is as shown below.